Ngenge Irrigation Scheme Infrastructure & Facilities - Kween

Country

Uganda

District

Kween

Sector

Irrigation

Client

Ministry of Water and Environment

Status

Completed


Main Components

•Head works:

Two RCC C-35 Head works (Weirs, Intakes, Settling basins, crossing bridges, Protections etc.) on two rivers.

Main canals (Lined with C-25 concrete).

Two Night storage reservoirs with Clay and Gravel filled embankment.

Secondary canals and associated lined canal with Cross regulators, Drop structures and Crossing bridges.

Tertiary canals and associated structures – Unlined canals with Turn out structures, Drop structures and Outfall structures.

Secondary, Tertiary drains and associated structures – Unlined Drains with Drop structures, Pipe culverts and cross bridges.

Various size of steel Sluice gates and Concrete gates for Tertiary turnouts.

FPD with blended materials and river dredging.

Roads including culvert crossings and side drains.

Includes Store, Office block, Residence blocks, Sanitation blocks, Guard houses and General civil works.